Wednesday, February 11, 2009

My Previous (crappy) Ronnel Barrera International Airport (RBIA)


These are the pictures of my previous Airport Terminal Building (RBIA) which is crappy and not good to look at. This airport has 15 gates that caters to selected international flights. Recently, I make a new RBIA Terminal Building which is much bigger and can handle 300 million passengers per year. It has 40 international gates that caters airlines from Europe, Africa, America, Asia, Australia and Pacific regions. All of the gates are A380 compatible each of which has a 3 jetway bridges. There is also a separate Domestic Terminal Building with Ten domestic gates that caters to Philippine Airlines and Cebu Pacific. This Aiport also has a Cargo terminal Building that caters to 20 aircraft. This new RBIA Terminal building is scheduled for completion on the last week of March 2009.















I just received my newest diecast airplane (Cebu Pacific 1:400 a320 phoenix models) which I ordered outside the Philippines. This model has a nice paint and cebu pacific livery. I am amazed on the realistic details that this model has. Above is the picture of my new babe.